Today I fired up the cement mixer for the last time before selling it on, its last job was to prepare the mix for concreting the yard. Here's some track laid out to determine the shape of the job and the likely track layout.
The top stone scraped away ready for the mix, plants cut back and forms laid in either side of the pour.
Mixer doing its thing for the second to last time (Two mixes were required)
Concrete laid out, tamped and floated up, not perfect but everything is going in the right direction level-wise. The very ends of the sidings will project beyond the concrete and be over stone only.
The whole job covered up against the promised rain and cat paw impressions (Dusty had a go before I'd done this but I got there first) The branch bridge abutment bases were put in too.
I am looking forward to uncovering it all tomorrow evening
Simon