Adams T3

Discussion in 'G1/32' started by Thirtysecond, 18 January 2019.

  1. Thirtysecond

    Thirtysecond Western Thunderer

    Working on the backhead now. Added glasses to water gauges with cuts in the back of the rod to represent the water tubes.

    7325ADA1-A890-421C-B9AA-A91B02CAC4E0.jpeg


    Levers too long. I've chopped those. Copper pipework now being added. Water gauge drains still to do (today if I have time). Update; yes I had time!

    CA53C831-7035-4A15-B6C0-9D1AAB9007F7_1_201_a.jpeg
     
    P A D, Peter Cross, Andrew and 4 others like this.
  2. Thirtysecond

    Thirtysecond Western Thunderer

    Now steamed on both Meths and coal. Meths - easy peasy, Coal - still on learning curve but we'll get there! 06A7CAE2-65DE-4150-91DD-60CFB14BE50D_1_201_a.jpeg 66456519-94E4-419E-A84E-3A70179F0129.jpeg 460E735C-319C-47DD-AAFA-4082E5EAC98D.jpeg
     
  3. P A D

    P A D Western Thunderer

    The water gauges look good and the cut seems to work as well as drilling through. I'll give that a go next time as I think it will be easier than drilling, especially in 7mm scale.

    Fantastic model by the way.

    Cheers,
    Peter