How much! (By page 1 mega cheap) Heljan Dogfish V The Cambrian C12 Dogfish Build

AdeMoore

Western Thunderer
Here we go calling it all but there, about 80% happy with it. Couplings to add but will solder them up for both wagons when I’ve done the next one. A lamp to add just need to paint it first.
I noticed the wheel sets are odd too! Started June 25th so 4.5 months to build in lunch 20mins in the van lost counts of the hours spent safe to say loads. Learnt a lot though.

58DB1FAF-CC1D-4158-A4F8-4E8733A0626F.jpeg B2BCAAF8-1A27-4E43-B02E-F8E380F8530C.jpeg

Added a bit extra on the brake rigging but not to the extent of Adam’s build!

C13AF86E-BBDE-4A4C-8CFC-C99D33780987.jpeg D8BE866A-916F-4A84-A74E-35B0B2CAB4DA.jpeg 66DD868E-3169-48D0-A0EF-C3366A67E6D2.jpeg 47C24DD2-4101-47C6-BB2D-39D4D53EF88E.jpeg 3A7617B8-502E-4C82-A15C-AFD5794A31F0.jpeg 69BE3D4C-D073-41FD-9FA4-1D8E3F5455F8.jpeg

Need to add some lead a d some removable loads just thought of.
Until next time
Cheers
Ade
 

AdeMoore

Western Thunderer
Just over a year later and they are both finished! Crazy how long that took but it was just 20 mins here and there in the van at lunch! Poor image after the on location photos didn’t work out. iPad paint had to be used to make it usable here.

CC06932B-9761-49FA-A9CB-1A250066F4B9.jpeg
 
Top