Here is the plan of my new 7mm layout based of a GWR tremius branchline station set in 1930-1950. Basicly there will be 2 pass trains per day, morning and night. A local freight and a extra market train per week. No feight on the week-end.
Track will be haid laid using exactoscale part and rail. Power will be via a PMW controler with extras.
[attachment=0:2eldbqog]The Plan.gif[/attachment:2eldbqog]
Layout size will be 8' x 500mm with a 4' fiddler yard on the left side. I also how to build more section to add on as time permits
OK, I will post more later
Stuart in OZ
Here is the plan of my new 7mm layout based of a GWR tremius branchline station set in 1930-1950. Basicly there will be 2 pass trains per day, morning and night. A local freight and a extra market train per week. No feight on the week-end.
Track will be haid laid using exactoscale part and rail. Power will be via a PMW controler with extras.
[attachment=0:2eldbqog]The Plan.gif[/attachment:2eldbqog]
Layout size will be 8' x 500mm with a 4' fiddler yard on the left side. I also how to build more section to add on as time permits
OK, I will post more later
Stuart in OZ