A few things to add.
Work on model building has slowed since recommencing a career in Engineeering Design.
However, I have researched and drawn up an LMS Compound for Scaleseven which is turning out to be very rewarding based on the scale and skillset applied to this project.
I am combining everything I have learnt over the past 10 years or more to produce something fitting, with a miniumum of etching used, most parts are machined or fabricated by hand, and all the rivets are embossed, making very good use of my CAD model to position these details. The frames are to be in 3 sections as per the prototype and have lap joints to provide a useful narrowing toward the front of the engine, which is very slightly exaggerated by using slightly overscale frame material. All the frame parts are cut from 0.8mm nickel silver sheet.
I have tried hard to reproduce the subtle variation in rivet size and type throughout the model, so for example the cab has 4 rivet sizes.
The tender tank has progressed well, though presented some challenges in that although based on Deeley's 3500 gallon tender, its tank is rebuilt from a 4000 gallon bogie tender, and no drawing can be found for this. Cross referencing with various Midland Railway GA's and meticulous observation of photos helped give something that must be very close.
Thoughts are shifting to the frame stretchers and motion, the Richard Hersey produced wheelset having been in hand for some time now so it is about time they were put into use.
The frames and bogie are profile milled with a template also milled and drilled to be used as an embossing pattern. Care must be taken to ensure the correct rivet or bolt head is reproduced for each side and each face of the frame component, and this is particularly so on the areas of lap joint.
I must also add that the K3 although finished for some time now, it had a number of extra pictures taken for its MRJ article though very few of the completed model were used.
Best regards
Tom