Ok I’ll bite. Please elaborate.I think what disappoints me about this layout is the lack of ambition.
Tin hat on, sprinting for cover.....
Ok I’ll bite. Please elaborate.
It’s full of pointy and heavy bits of metal, cable trip hazards, H&S nightmare!All that unused room in the center - you could have a completely different show in there... Or a marching band, or a pub, or RC model aircraft taking off and landing...
Thanks Adam, we were pleased with the 8 hours, (2nd time out) it definitely helps that the five of us work well together and ‘understand’ the concept of how it builds, and breaks. A lot of thought went into the design and the quality of the boards, (particularly Tim Horn’s), wiring, trestles, backscene, and lighting help massively. Because of the size of the layout there’s a lot of similar tasks, and once you get into a work flow quite quickly. I had to leave them yesterday as I was on an 0550 wake up this morning. Having walked 39 miles since last Wednesday I didn’t have any trouble sleeping.I think an 8 hour breakdown is a pretty fair effort given the complexity and what, the second or third time of trying? Hope you're putting your feet up now, Paul.
Adam