Weather here has been better than forecast so we spent the morning on the beach before the southern wind picked up. Since then I completed the Moor Street approach road and shot this short video.
The Lee Marsh Jubilee is my most demanding track tester and more demanding of reliable track when running in reverse.
The movie starts on Platform 3 and runs across the double slip, then the better than expected curved point before passing between headshunts and sidings to the point where local trains will pass into the yet to be constructed 2 road fiddle yard. Then the Jub joins the Down main line and next should have moved over onto the Up main line using the scissor crossing.
my next job will be to glue down the track between the fiddle yard point and the point where the approach road joins the existing main line. And add the gap sleepers!
There will be a speed limit on this section of 40/126 dcc steps though I have had no problems running at 60/126.