Tim Watson
Western Thunderer
After the summer recess, I’m now back up in the garret working away; also thought a new thread would keep things together. I have just made the steps for Lord President, as can be seen below:
Quite a simple job, making up a length of appropriately dimensioned n/s strip with the supporting bracket pre-bent into place. The edge protector to stop boots going the wrong way was then bent up, having filed a nick into the bracket strip. Not quite accurate, but good enough for government work. They are surprisingly large steps on an LNER eight wheel tender (or maybe we have become used to commercial models where the frames are too far apart and the steps are then narrowed).
Lord President did a bit of running on CF at our last exhibition in Peterborough. This youtube video shows it storming up through Belle Isle with 20 coaches on the back.
Tim
Quite a simple job, making up a length of appropriately dimensioned n/s strip with the supporting bracket pre-bent into place. The edge protector to stop boots going the wrong way was then bent up, having filed a nick into the bracket strip. Not quite accurate, but good enough for government work. They are surprisingly large steps on an LNER eight wheel tender (or maybe we have become used to commercial models where the frames are too far apart and the steps are then narrowed).
Lord President did a bit of running on CF at our last exhibition in Peterborough. This youtube video shows it storming up through Belle Isle with 20 coaches on the back.
Tim