Don't worry Graham, I had spotted that! I shall also be bushing the pivot
I do not know how the JLTRT or Easybuild MK.1 BR1 bogies fit to the floor... in the case of the Gresley coaches the bogie has a w/m bolster with a hole for a 4mm set-screw, the set-screw goes into a nut-sert in the floor moulding.
The shouldered screws which have been made for me, thank you Paul, are 4mm x 1mm thread, with a shoulder of 5mm diameter and a head of 8mm diameter, hence there is a need to enlarge the hole in the bolster. The shoulder of the screw is long enough that the bolster can rotate free when the screw has tightended into the nut-sert.
The floor moulding has a flat area of around 1cm x 1cm surrounding the nut-sert, the corresponding area of the bolster is a ring, about 10mm ID and 13mm OD. I have put a 15mm diameter circle of styrene on the floor moulding to increase the contact area between bolster and floor - the thickness of the disk is that which is required to set the buffer height at the required dimension. As yet I have not been able to complete the job because I am not sure how to produce the necessary part in the required quantity. The ring on the top of the bolster is about 3mm deep and I intend to fit a styrene washer, of diameter to fit inside the bolster ring, to the underneath of the floor moulding. This disk shall not be thick enough to take any vertical load, the purpose of the washer is to act as a constraint on horizontal loads along the carriage centre line. Why? To limit any tendency for the bogie pivot bolt to rock for and aft when running.
regards, Graham